System Upgrade & Migration
Move legacy controls onto current, supportable platforms — phased so the plant keeps running, and documented so the result is genuinely maintainable, not just technically working.
/ What's included
Scope of work
Migrate legacy PLC, SCADA, and HMI systems to current platforms with minimal downtime and complete documentation.
Helps with: SLC/PLC-5 migrations, unsupported SCADA, end-of-life HMI replacements.
- Existing-system audit, I/O mapping, and risk review
- Target platform recommendation and bill of materials
- Phased cutover plan with rollback options
- Code conversion with cleanup, not just translation
- Side-by-side or staged commissioning
- Operator training and updated documentation
/ Where this fits
Typical use cases.
- 01SLC 500 / PLC-5 → ControlLogix / CompactLogix
- 02Unsupported HMI → Ignition or VTScada
- 03Modicon Quantum → M580
- 04Legacy serial polling → modern Ethernet/IP networks
Related services
All servicesControl Panel Design
Industrial control panel design for pump stations, treatment plants, telemetry sites, and process equipment, using code-conscious, UL 508A-style practices.
Learn morePLC & HMI Programming
Stable, well-documented logic for pumps, chemical feed, tanks, interlocks, alarms, and operating modes — code that maintenance teams can actually follow.
Learn moreSCADA & HMI Development
Operator screens that are readable and organized, with high-performance HMI principles, meaningful trends, and clear alarm presentation.
Learn more/ Have a project in mind?
